Sourcing, supplier vetting, negotiation and quality control are the core. Delivery through our own China–Africa network is included.
From the first supplier shortlist to the last signed delivery note, one team owns the purchase.
Before a single order is placed, we turn the bill of materials into a buying plan: what to buy, to which specification, from which suppliers, which items are long-lead, and where a delay would stop the project.
The plan is re-cut while the project runs — demand changes, suppliers slip, routes close — against the delivery date rather than last month's forecast.
We screen suppliers for capability and specification fit, run competitive RFQs, negotiate price, terms and lead time, then place and follow the order.
Multi-currency settlement and procurement reconciliation are handled in the same service, so commercial paperwork does not become a second job.
Quality is checked before cargo leaves the factory, against the agreed specification and packing list. For high-value, customised and large-scale project cargo, the control points are agreed up front and documented.
Where an item fails, it is held at the supplier or in our warehouse until it is corrected — it does not travel to site and become a site problem.
Our 1,600 m² self-owned warehouse is zoned by cargo type — industrial spare parts, oils, safety supplies and site living supplies — with moisture-proof and anti-theft controls. Mixed consignments are received, checked, packed, reinforced and loaded in one place.
Inventory is managed dynamically: shortages and overstock are flagged before they become a site problem, and fast-moving consumables can be held as safety stock at the hub.
This is where we go beyond a buying office: air, sea and multimodal freight, local clearance, escorted delivery and on-site coordination. The delivery network is ours, so it is included rather than subcontracted and forgotten.
High-value equipment, bulk goods and urgent orders move through the same corridor, with risk control built for complex environments. Regular supplies ship monthly in bulk; emergency spares are held as safety stock at the hub.
For teams building or repairing a cross-border buying operation, we provide industry trend analysis, compliance guidance and policy interpretation — grounded in live corridor experience rather than generic playbooks.
Team operation training is delivered against your own process, so the handover from planning to daily execution is not a second project.
Eight steps, each with a named owner and a documented handover. The same sequence runs whether the cargo is a drill bit or a substation.
The mode is chosen per item and per consequence of delay — not per shipment.
| Mode | Transit to Lagos | Best for | How we run it |
|---|---|---|---|
| Express air | 2–3 days | Line-stopping spare parts and sudden equipment failures. | Reserved capacity and priority handling; safety stock at the hub for repeat failures. |
| Regular air | ~10 days | Electronics, precision parts and smaller urgent consignments. | Consolidated departures with pre-booked space for restricted and battery cargo. |
| Sea freight | By sea | Bulk consumables, heavy, extra-long and extra-wide project cargo. | FCL or consolidated loads, with oversize handling and door-to-door escort on arrival. |
Multiple suppliers, one loading plan. Cargo is received against the purchase order, checked, packed for the route and loaded once — instead of arriving at the port as separate consignments with separate paperwork.
A quotation is only useful if it can be challenged. Ours is written to be.
A price, a landed cost and a delivery plan — in writing, against your bill of materials.
We price the buy end to end: goods, consolidation, freight, clearance and delivery. Where a cost depends on a route or a classification, it is shown as a range with the condition that moves it.
The risk note names the items most likely to slip, the documentation that is easy to get wrong, and the mitigation we would put in place. If the date cannot be held, we say so before the order rather than after the vessel sails.
Bill of materials, destination and required-by date is enough to start.